Skip to content

Movement Ties

Movement Ties

Ancon PPS/PPB/PPV/PP21 Movement Tie

Debonding sleeves are used on plain-ended wall ties at vertical movement joints. The tie will restrain the masonry against lateral wind loads but the sleeve will allow the masonry to expand or contract. Debonding sleeves should be installed with a 10mm gap at the end to allow for expansion of the masonry.

PPS Movement Tie

Debonding Sleeve

Debonded Ties require 100mm embedment. A 120mm long sleeve will provide an allowance for movement and tolerance, and will be suitable for most applications. Other lengths and sizes available to special order.

Latest News

HALFEN AS5216-Compliant Anchor Channels from Ancon

Available exclusively in Australia from Ancon, HALFEN HTA Anchor Channels demonstrate compliance with Australian Standard AS5216 ‘Design of Post-installed and Cast-in Fastenings’ through a new European Technical Assessment (ETA).