City West Cable Tunnel, Sydney

Ancon stainless steel brackets have been used to support the heavy duty cables along the full length of the City West Cable Tunnel in Sydney.
The cable tunnel was constructed by Thiess as part of EnergyAustralia's major upgrade of electricity infrastructure of Sydney. Measuring 1.7 kilometres long and 3.5 metres wide, the new tunnel carries transmission cabling across the city's central business district.
The maintenance-free life and proven integrity of stainless steel, combined with Ancon's fabrication expertise, means no costly remedial measures will be required for the life of the structure.
Ancon was selected to manufacture this high specification support system due to its proven track record of supplying volume orders of standardised components.
Related Products
Special Fabrications
High Integrity Steel & Stainless Steel Fabrications
Latest News
Leviat further enhances its Ancon Shearfix stud-rail calculation program
Leviat has released an enhanced version of its popular Ancon Shearfix design software that enables engineers to maintain a flat concrete slab at column heads by reinforcing the area against punching shear with a prefabricated, stud-rail system.
New Technical Literature for Masonry Reinforcement
Our full range of Ancon Masonry Reinforcement products are now featured in a new brochure.